Project Overview

S. No.ParticularsDescription of Development of Pr oject Highway
1Project locationBalagondapalli to KNT/Tamil Nadu Border from Km 144+1 70 to Km 179+936
2Existing LengthGreen Field Alignment
3Design Length35.766 km
4DistrictKrishnagiri
5Existing Lane ConfigurationGreen Field Alignment
6Design Lane ConfigurationProposed lane configuration is Four lane Divided Carriageway with paved shoulder
7BypassesNIL
8Realignment35.766 km
9Width of Carriagewaya. Main Expressway – Paved Carriageway shall be 22.00 meters for four lane sections excluding median but including edge strip and Paved & Ea rthen Shoulder.
b. Loops/Ramps – Paved Carriageway shall be 8.5 meters wide for 2 lan es;
20.5 meters (2×10.25 m) for 4 lanes (divided carriageway) excluding m edian including edge strip.
c. Cross road (VOP) – Paved Carriageway shall be 11.0 meters wide for 2 lanes and 2×14.0 meters wide for 4 lanes with a median open to sky.
d. In addition to the above widths of paved carriageway, additional lane /lanes shall be given as acceleration/deceleration lanes, toll plazas and taper for Loops/Ramps to the required length shall be provided at the r espective locations as per specifications.
10Design Speed100 kmph for plain/rolling terrain
11Proposed Pavement TypeFlexible Pavement – Flexible pavement type for main carriageway and Interchange Loop and Ramp; for connecting road.
Rigid Pavement – Rigid pavement for Toll Plaza including taperin g zone.
12Toll Plaza1 Nos at Km. 176+500
13Rest Area2 no’s
1. Km 147+820 to 148+020 RHS
2. Km.148+908 to 149+008 LHS
14Truck Lay ByNIL

Status of Structures
Flyover/Viaduct – 10 No’s
Interchange (INT) – 05 No’s 
VUP – 05 No’s
LVUP+Canal – 04 Nos
LVUP – 08 No’s
MJBR – 01 No
MNBR – 12 No’s
MNB(on Service Road) – 01 No
RUB – 01 No
VOP – 02 No’s  BC – 47 No’s

Total Scope – 96 No’s